Not every bridge arrives as a single lump sum. Some are set up as a revolving bridge line, a credit facility you draw against as bills arrive, then close out when the long-term money shows up. It’s a useful structure to study, because it makes every pricing component visible month by month.
What follows is a one-year diary kept by a fictional owner, Lena, of Millbrook Wholesale Bakery. Lena is moving into a larger plant while waiting for her old building to sell. Her facility is illustrative, and real bridge pricing varies considerably by lender, collateral, and exit plan.
The terms she signed:
|
Item |
Amount |
|---|---|
|
Bridge line commitment |
$240,000 |
|
Interest rate on drawn balance |
14% per year, paid monthly |
|
Origination fee |
2% of commitment ($4,800) |
|
Draw fee |
1% of each draw |
|
Unused fee |
0.25% per year on undrawn funds |
|
Exit fee |
1% of balance at payoff |
|
Maturity |
12 months |
Month 1: Deposit Day
Drew $90,000 for the new plant’s deposit and permits. Draw fee: $900. The origination fee of $4,800 was charged at closing, so I’ve paid $5,700 before a single loaf has moved. Interest this month: $1,050. Unused fee: about $31, which feels like a parking meter.
Before signing, I compared how lenders describe bridge products. The Fundivi bridge capital rates overview was one of the pages I read, and I kept a list of the terms I still needed each lender to put in writing.
Month 2: A Quiet One
No draws. Balance stays at $90,000. Interest: $1,050 again. Cumulative interest: $2,100. It occurs to me that the bridge costs me about $35 a day just to stand still.
The unused fee was another $31. My accountant asked what the exit is. I told her the old building sells, and we repay everything. She asked what happens if it doesn’t sell. I need a better answer than that.
Month 3: Ovens
Drew $60,000 for the first oven installation. Draw fee: $600. Balance is now $150,000. Interest jumps to $1,750. Unused fee down to about $19. Cumulative interest: $3,850.
I built a backup plan. If the old building hasn’t sold by month 10, I’ll ask my bank about a longer loan against it.
Month 4: Comparing Notes
No draws. Interest $1,750. Cumulative: $5,600.
Lunch with another owner, who took a bank loan for a similar move. Her rate was lower, but her closing took months, and she almost lost her site. I’d have loved a bank’s price. I just didn’t have a bank’s calendar. Reading up on how bank underwriting differs from a direct lender’s process made me want to get a bank conversation started early for whatever comes next.
Month 5: Second Oven and Refrigeration
Drew $50,000. Draw fee: $500. Balance reaches its peak at $200,000. Monthly interest: $2,333. Unused fee only $8. Cumulative interest: $7,933.
I’m now paying more than $76 per day in interest. If I’d drawn all $240,000 on the first day, I would have paid interest on money that was sitting idle. Drawing as needed has cost $2,000 in draw fees so far, but I’ll take that over carrying the whole amount from the start.
Month 6: Halfway
Interest: $2,333. Cumulative: $10,267. A buyer has toured the old building twice. Nobody has offered yet.
I reread the contract’s default section. It’s triggered by missed payments, and also by a failure to pay at maturity. So maturity day is a real deadline, and there’s no assumption that it will extend automatically.
Month 7: Plant Opens
We baked our first commercial batch in the new space. Interest: $2,333. Cumulative: $12,600. Output is up, and so is the payroll.
Other financing keeps landing in my inbox, and I’ve been reading comparison material, mostly to learn which terms I should be asking about. So far nothing beats simply finishing this plan.
Month 8: First Paydown
A large grocery chain paid a long-overdue receivable, and I put $40,000 toward the balance. Balance is now $160,000. Interest falls to $1,867. Unused fee rises to about $17. Cumulative interest: $14,467.
Feels great to see the number go the other way. There’s no prepayment penalty on the line, so every dollar repaid stops costing 14% immediately.
Month 9: Offer on the Old Building
Written offer received, with closing projected for month 12. Interest: $1,867. Cumulative: $16,333.
Three months remain. If closing slips, each extra month costs another $1,867, plus whatever an extension might cost. I emailed the lender to ask what an extension would involve, while I still have some leverage and some time.
Month 10: Backup Plan Check
The lender says an extension would be considered based on the sale contract, but it isn’t promised. Interest: $1,867. Cumulative: $18,200. I’ve also started the long-term financing talk for the equipment, because I’d like to replace part of this expensive debt anyway.
A release on term loan options and SBA lending figures gave me some background for that conversation, keeping in mind that it’s a company’s own announcement.
Month 11: Inspections
Buyer’s inspection passes. Interest: $1,867. Cumulative: $20,067.
I asked the title company for a payoff timeline, and I asked the lender for a written payoff letter showing the balance, the interest through closing, and the exit fee, so that nobody is surprised at the table.
Month 12: Payoff
The sale closed. Interest for the month: $1,867. I repaid the $160,000 balance and the 1% exit fee of $1,600. Total interest: $21,933.
The Final Bill
|
Cost component |
Amount |
|---|---|
|
Origination fee |
$4,800 |
|
Draw fees |
$2,000 |
|
Interest |
$21,933 |
|
Unused fees |
$208 |
|
Exit fee |
$1,600 |
|
Total cost |
$30,542 |
My average balance over the year was about $156,667, so the total cost came to about 19.5% of the average money in use, against a headline of 14%. Fees added more than $8,600 to the bill.
What a Lump-Sum Bridge Would Have Cost
Lena’s other quote was a conventional bridge loan: $200,000 funded on day one at the same 14%, with a 2% origination fee and a 1% exit fee, and no draw or unused charges.
|
Cost component |
Lump-sum bridge |
Her bridge line |
|---|---|---|
|
Interest |
$28,000 |
$21,933 |
|
Origination |
$4,000 |
$4,800 |
|
Draw and unused fees |
$0 |
$2,208 |
|
Exit fee |
$2,000 |
$1,600 |
|
Total |
$34,000 |
$30,542 |
The line’s extra fees looked irritating every month, yet it finished about $3,458 cheaper, because the interest stopped running on money she didn’t yet need. That result assumes her draw timing held. A project needing all the money immediately would have favored the lump sum.
What the Diary Teaches
Fees cluster at the edges. Most of the non-interest cost arrived at closing, at each draw, and at the end.
The exit date is the largest variable. Had the $160,000 been repaid at month 9, Lena would have saved three months of interest, or about $5,600.
Have a second exit. A bridge built on one event, such as a sale or a loan approval, depends on that event’s timing.
Draw only what you need. Interest applies to what you’ve taken, so staging your draws can matter more than a small change in the rate.
Keep a running total. Writing down one number each month keeps it real.
Start Your Own Diary
Before you close a bridge, write down your expected month-by-month balance and each fee beside it. Then add three entries you hope never to use: a one-month delay, a three-month delay, and the day your primary exit falls through. If those pages are unreadable, reconsider the size of the facility.
Frequently Asked Questions
What’s a typical business bridge loan rate?
It varies widely by lender and collateral, and is generally higher than long-term bank financing. Always ask for total cost, including fees.
Are bridge loans usually interest-only?
Many are, with the principal due at maturity or from a specific payoff event. Some have other payment structures.
What is an exit fee?
A charge due when you repay the loan, often a percentage of the balance or original commitment.
What if the exit event is delayed?
You may need an extension, refinancing, or another source of repayment. Ask about those terms before signing.
Can a line of credit serve as a bridge?
Yes, when a revolving facility is used to cover a temporary gap, though terms and limits differ between lenders.
How do I calculate my true cost?
Add every fee to the total interest, then compare that with your average balance over the time you held it.
Is collateral required?
Often, particularly for larger amounts, and a personal warranty may also be requested.
Disclaimer: This content is for general informational purposes only and should not be considered as financial advice. The content is not intended to be a substitute for professional financial advice, investment advice, or any other type of advice. You should seek the advice of a qualified financial advisor or other professional before making any financial decisions.






